MISSION CRITICAL/DATA FACILITIES
PROJECT: Kansas City Data Center
LOCATION: Kansas City, MO
PROJECT SCOPE:
We designed a new 900-ton variable primary chilled water plant with water-side economizer designated to serve a new data center expansion and reserve the existing facilities chilled water plant.
The design included the additional capacity to allow for the chilled water plant to be expanded to 1500 ton in the future. Many solutions were considered in this project to minimize downtime during the construction, optimize performance and provide a reliable system.